Thorpe Hall School, Southend – New Sports Centre
This project was the full groundworks package; Starting with installation of the piling mat. Then the excavation of groundbeams and pile caps for the reinforced groundbeams. Permanent formwork was constructed ready for the concrete placement. A large storm water attenuation tank was installed, as well as all below ground drainage and a pump station.